01/ 07Design
Design & Prototyping
3D routing, BOM and first-article samples validated against your drawings.
- Input · drawing / BOM / sample
- Output · 3D routing + first article
Craft · Seven processesYITONG
Scroll to assemble a YITONG harness process by process — from design to 100% inspection. Click any step to jump, drag to look around.
01/ 07Design
3D routing, BOM and first-article samples validated against your drawings.
02/ 07Cut & strip
Cut length and strip dimensions checked against engineering drawings and work instructions.
03/ 07Crimp
Terminal specification, crimp appearance and retention force checked; sampling: 4 pieces every 2 hours.
04/ 07Braid
Tinned-copper tight braid, ≥ 92% coverage, effective EMI suppression.
05/ 07Molding
Custom injection and overmolding for strain relief and sealing.
06/ 07Routing
Cable ties, sleeves and labelling per the loom drawing — neat and traceable.
07/ 07Inspect
Continuity testing and visual inspection, with final inspection records before shipment.
✓Assembled
Every harness follows the same documented process. See the ten-stage QC plan behind it.
QC1T-W-PG-010 · REV. B0
Behind the seven processes sits our QC control plan — from incoming inspection to finished-goods storage, each stage with its frequency, method and record.

01MATERIAL / IQC
Check purchased materials against engineering data, inspection specs and the supplier outgoing report.

02MATERIAL / CONTROL
Storage: stock card, location label and protection. Issue: match name, part number and quantity to the work order.

03PROCESS / DIMENSIONS
Verify wire spec, cut length and strip dimensions; check conductors for damage or broken strands.

04PROCESS / CRIMP
Check terminal spec, crimp appearance and retention force to the drawing and work instructions.

05PROCESS / CHECK
Inspect terminal specification and crimp appearance with a magnifier.

06ASSEMBLY / POSITION
Insert terminals into the housing; confirm wire order, wire positions and terminal seating.

07ASSEMBLY / PROTECTION
Fit the specified sleeve and shrink it in place without heat damage.

08FINAL / INSPECTION
Run continuity test to the required parameters, then visual inspection.

09DELIVERY / RELEASE
Confirm packing method, then sample finished goods to specs, drawings and customer requirements.

10DELIVERY / STORAGE
Store accepted finished goods with matching stock records, correct location labels and protection.
¹ Cutting, sheath stripping and wire stripping: 4 pieces / 2 hours. Photos show our factory, not necessarily the specific operation. Consult the original plan for individual requirements.
YITONGBuild to print
Drawing, BOM or sample — an engineer replies within 24 hours with process and quality questions answered.